Standard Pipe Clamp rubber flat clamp - M8+M10

FOB Reference Price:Get Latest Price
US $0.15-5 / Pieces | 200 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
TOK
Model Number:
201
Usage:
Pipe Clamp
Material:
Metal, STEEL - DC 01
Structure:
Suspension Clamp
Standard or Nonstandard:
Standard
Size:
3/8" 1/2" 3/4" 1" 1 1/4" 1 1/2" 2" 2 1/2" 3" 3 1/2" 4" 5" 6" 8"
Nut:
M8 M10
Working Temp:
-40 ℃ ~ 110 ℃
SupplyAbility
SupplyAbility:
500000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
20pcs-220pcs per carton
Port
FOB Ningbo
Lead Time :
Shipped in 30 days after payment

rubber flat clamp - M8+M10

 

Description:  

For Ventilation Pipes            For Heating Pipes
For Waste Water Pipes        For Basin Pipes
 
Technical Parameter
1/8" - 2"                                  Max Loading:1.5kn
2 1/2" - 3 1/2"                        Max Loading:2.3kn    
4" - 8"                                     Max Loading:2.8kn
 
Working Temp                    -40 ~ 110 Degree
Material                                Steel - DC 01
Furface Finishing               Zinc-Plated ≥ 8 µM
Rubber Profile                    Epdm
Noise Leve                         17DB (A)
Screw Max Torque             M5-1.0 NM M6-2.0NM
 
Note: Thread Rods Should Be Fully Screwed Into Nut

*Used for mounting of pipes to the vertical / horizontal
walls, ceilings and floors

*EPDM lining for:
– noise reduction level up to 17 dB according to DIN 
 4109 vibration reduction
– partial compensation of thermal expansion
*Easy and safe assembly through Philips combi side screws.
*Side screws are protected against loss during assemble
with the help of plastic washers.

 

 

CODESIZERANGESTRIPSCREWNUTPCS/CTN
MMMMMM
201-183/8”15-191.5*20M6*20 M8+M10 200
201-221/2”20-251.5*20M6*20 M8+M10 200
201-283/4”26-301.5*20M6*20 M8+M10 180
201-351”32-361.5*20M6*20 M8+M10 120
201-401 1/4”38-431.5*20M6*20 M8+M10 100
201-481 1/2”47-511.5*20M6*20 M8+M10 150
201-54-53-581.5*20M6*20 M8+M10 150
201-602”60-641.5*20M6*20 M8+M10 150
201-70-68-721.5*20M6*20 M8+M10 120
201-752 1/2”74-801.5*20M6*20 M8+M10 120
201-83-81-861.8*20M6*20 M8+M10 100
201-903”87-921.8*20M6*20 M8+M10 100
201-1003 1/2”99-1051.8*20M6*20 M8+M10 75
201-110-107-1121.8*20M6*20 M8+M10 75
201-1154”113-1181.8*20M6*20M8+M1060
201-125-125-1301.8*20M6*20M8+M1050
201-1405”138-1421.8*20M6*20M8+M1050
201-1606”159-1661.8*20M6*20M8+M1080
201-2008”199-2051.8*20M6*20M8+M1050

....Please Visit our website by www.tokfix.com to know the detail specificiation; or send email to 
  for one-stop professional severice.

  

Company Information

 

 

TOK HVAC Components Industries Co., Ltd is a professional manfacturer and trader for more than 100 different A/C parts.

 

TOK-METAL: Professional Stamping Basement.

 

TOK-PLAST: Professional Plastic Injection Factory.

 

TOK-INTER: Professional Exporting Team.

 

FAQ

1-What is your min quantity?

 

-Min order value is not less USD5000.

 

2-What is the normal delivery date?

 

-20-25 days against the deposit received.

 

3-What products is your self-produced?

 

-All stamping and all plastic parts.

 

4-Where is your main market?

 

-Gulf Countries and East Europe.

 

5-How to contact your guys?

 

-Send us inquiries by alibaba or emails directly to 

 

For the details, please visit TOK website at www.tokfix.com